Quality Control And Finishing

  • All products shipped under self inspection & quality certification meeting the customer requirements & specification.
  • Sophisticated calibration management system developed, maintained & kept on record for all measuring devices through out the organization.
  • Full material traceability & quality documentation.
  • CMTR reports maintained as required.

  • Third party inspection as per 3.2 Cert. provided.
  • All pressure containing parts are hydro tested after machining. Full records of pressure testing maintained and supplied to customers when required.
  • Fully integrated quality plan, procedure used from raw material to finish products.
  • Machine-CARL Zeiss CONTURA G2 CMM is used to inspect new development samples & also used for critical dimensions in regular productions.

Quality Control Instruments

  • Machine-CARL Zeiss CONTURA G2 CMM
  • Air Gauges
  • Micrometers –Inside/Outside
  • Electronic Tool setter in CNC
  • Hardness testing Machines
  • Bore Dial Gauges
  • Various Thread Ring & Plug Gauges
  • Special Purpose Gauging Masters To Measure Large Bore

  • Two Axis CMM-Trimos
  • Electronic Depth/Height Gauges
  • Various Lever & Plunger Dial
  • Snap Gauges
  • Paint thickness & analyser
  • Electronic Mitituyo Surface Finish Analyzer
  • Hardness testing Machines
  • Electronic surface finish analyzer
  • Special purpose gauges

  • Profile Measuring Contracer
  • Pressure Testing
    • Shell / hydro testing 4 nos.
    • Air under water – 1 no.
    • High pressure testing – 1 no.
    • Hardness Testers.
    • Brinell Hardness – 4 nos.
    • Poldi hardness - 1 no. for large parts.

Finishing and Packging

  • All casted machined parts are finish painted, tested, packaged and are ready to use in assembly of Pumps and Valves.
  • All packaging as per international sea-worthy export packaging standards conforming to APHIS(USA) and IPPM(Europe) standards.

TOP